- New ConstructionFNF provided design and construction services to pulverize four miles of the existing 4-lane AC roadway and replace it with a new 6-lane PCCP urban freeway. FNF built 21,000 LF of new sound barrier walls, improved drainage, and installed a complete lighting system for the new freeway.
- Driveways
- Asphalt Paving
- ExcavationThe FNF Team was selected as the CMAR contractor to provide preconstruction and construction services to reconstruct a portion of US 89 which was damaged in the February 2013 landslide. Excavation of over 1,000,000 CY was required to construct a new rock buttress.
- Retaining WallsFNF, as part of a Joint Venture, was selected to perform one of ADOT’s largest urban freeway construction projects. The project runs along 11 miles of Interstate 10 between Loop 202 (Santan/South Mountain Freeway) and I-17 near Phoenix Sky-Harbor International Airport. It consists of widening, adding Collector-Distribution roads, rebuilding I-10 interchange with SR 143 to improve traffic flow, replacing and widening bridges, building pederstrain and bicylists bridges and building sound and retaining walls.
- Masonry