- Flooring2 miles of in-slab radiant floor heating system supported by high-efficiency natural gas boilers linear feet of heated flooring underneath of the slab
- Door Installation/Replacement
- Drywalls
- Framing
- Ceiling FansCoordinate the efforts of the many unique building functions including lubrication system distribution, air compressor system, vehicle exhaust and two 14-foot ceiling fans
- Room Additions
- New Construction
- Demolition
- Fencing
- Driveways
- Asphalt Paving
- ExcavationKent Construction was awarded the Phase 3 of this long term project to convert the former Rodney Dorms at the University of Delaware into a park and stormwater facilities. When our team arrived, only the demolitiion and bulk excavation had been completed. We created a community park and adventerous playground for the City of Newark to enjoy!
- Retaining Walls- Over 800 yards of concrete was poured to create this park. Concrete work consisted of flatwork, concrete retaining walls, a 50 ft weir wall and many curved/wavy shapes - all poured and finished by Kent Construction.
- Window Installation/Replacement
- CarpentryThis project was a brand new high school & middle school for the Appoquinimink School District. Kent Construction was awarded the Carpentry & General Works package in 2018 for this 2+ year project.
- Insulation
- Masonry