- Air Conditioning Installation/Replacement
- Humidification/Dehumidification SystemsThe design/build 20,000 sq.ft cleanroom expansion to biomedical production facility was designed and completed within a 6-month project schedule. The HVAC systems incorporated HEPA filtration, desicant dehumidification systems, dust collection, and room pressurization controls.
- Duct WorkSheetmetal and ductwork. Our years of experience will get your project completed with attention to detail and in a timely manner.
- Sheet Metal Fabrication