- FlooringJust a few pics of the finish work. Finish work includes flooring, tile work, sinks, toilets, painting, cabinets, plumbing fixtures, walkways, and just about everything else you see, live with, and maintain in a home.
- DrywallsDrywall is a week long process, and it involves 3 steps using different crews who specialize in their respective areas. This includes rough drywall, mudding and taping, and the finish coat. Like the stucco, this requires a real artist for the perfect texture and appearance.
- FramingFraming, or getting the "sticks up," is started about a week after the concrete foundation is poured. Sheathing, or plywood sheets, are placed on top of the wall framing. Framing the walls is done by a rough framing carpenter, and the trusses/fascia/roof are completed by a more specialized crew.
- Tile Installation
- Cabinet Installation
- New ConstructionThe Calprop Group welcomes you to North San Diego County! The center of our process at the Calprop Group is Quality and Service. We make sure that your expectations are the baseline for what we deliver, and we will exceed your expectations. The Calprop Group mission is to always “do the right thing†by exceeding expectations, providing exceptional real estate and construction services, and leaving a positive impact in our community.
- Walkways
- Residential Roof RepairMost roofs today are supported by pre-made engineered trusses. The roof tiles are placed on the roof as soon as the roof sheathing is put down. We want to get the roof tiles up as soon as possible because the weight will help to settle the structure and avoid stucco cracks.
- Residential Roof Replacement/Installation
- Painting
- InsulationInsulation has a huge impact on sound and energy efficiency. It is always fun to see the look on the customer face when the insulation is installed because all the sounds are muffled without the echo, and it feels more like a real home for the first time.