- New ConstructionThe Authority requires design-build services for the U.S. Warehouse Electrical Modifications 2023 project in the U.S. Plaza of the Peace Bridge (“the Design Build Contractor (DBC)”). The DBC shall perform both design/engineering and construction services as applicable to deliver a turn-key solution.
Services
"Fish and Chips" found in 1 dish