- ExcavationSeparator was received on site, excavation to 18 ft deep was made, and 24 inch pipe was located at 12 foot elevation as per drawings. Ground water was flowing in at an extreme rate into excavation area and pumped directly into holding tank on site. Ground water flow could not be reduced and was more than the onsite treatment plant could handle. NSRC requested that we do not cut 24 inch pipe and back fill excavation area.
- WalkwaysComplete Excavation of site for a total of 6 cast in place concrete tanks, sizes were normally 55’x55’x28’tall with Galvanized Walkways w/Handrails. Complete installation of all electrical pumps, components and process control equipment. Complete installation of all underground Pipes, Site Drains and other ancillary pipe required for the completion of the SBR System interconnecting to the existing WWTP. Removal of Top 2ft of Existing Concrete in Ground Tanks and replaced with New Poured in Place Concrete. All QC Format and Security Clearances were completed as Requested by Customer.
- InsulationInstalled 5 Geothermal wells, excavate trench into residence, cut and removed old concrete floors in basement and garage, install new concrete floors with HDPE in floor tube installed, insulated entire basement and garage with spray on foam system and installed additional insulation in existing structure.