- Flooring
- Door Installation/Replacement
- DrywallsWe also have an option to insulate inside the frames to increase fireproofing and reduce thermal transfer. This saves approximately 80% in labor and material costs versus a typical steel building. Due to performance in a fire, the reparability, and shorter down time, we often save 15-50% on hazard insurance. We have a Pilot Scale test assembly meeting a one hour fire rating with 5/8" Fire code Drywall on one side only.
- FramingOur wood framing makes the buildings easy to finish off inside. Interior finishes are commonly white Dura Skrim, oriented strand board (OSB), white steel and sheetrock. Having the walls and ceiling framed 2' on center makes applying these liners fast and easy, saving time and money.
- New Construction
- SidingWood siding, plywood and shingled roofs, etc. are some of the "greener" choices that are easy to use on Eagle buildings.
- InsulationFiberglass insulation is the lowest cost, per R value and is made out of sand and recycled materials. "Green" fiberglass insulations are made with recycled content materials and may have better indoor air quality properties than conventional fiberglass.